header_main.gif
Home
Contact Us
Services
Clients
About Us
Copyright 2011 by Lamont Roe Werner Construction Company, Inc.
FAQ
News
Frequently Asked Questions
lamont_construction_2011006006.gif lamont_construction_2011006005.gif
1) What should I expect during a typical overlay?
2) Can my business remain open during construction?
3) When can I park on the new asphalt surface?
4) What is hot plant mix asphat (HPMA)?
5) What is a tack coat?
6) Will tack or "Fresh Oil" hurt my vehicle and how do I remove it?
7) What is a prime coat?
8) What kind of base does asphalt require?
9) What is lime stabilization?
10) What is soil cement stabilization?
11) Should I use limestone or soil cement for a base?
12) How thick does the base need to be?
13) How thick does the asphalt need to be?
14) Do you ever have "Leftover" or "Extra" asphalt?
15) What type of maintenance is requred?
16) What is the difference between "Leveling" and "Repairing" a pothole?
17) What is "Reflective Cracking"?